View Single Post
      03-04-2022, 04:31 PM   #16
Ionutz009
New Member
10
Rep
29
Posts

Drives: F85
Join Date: Nov 2020
Location: Europe

iTrader: (0)

Quote:
Originally Posted by M_Bimmer View Post
@ Ionutz009,

The 11-24 torque table you posted is for plastigage type PG1 torque step from the 11-24-571 procedure, which is merely determining connecting-rod bearing play....and is not the torque values to use when doing the final assembly of end cap to connecting rod final reassembly. These torque values are found in torque table 11-11.

But to answer your question:

Procedure 11 24, 1AZ torque procedure is if you are replacing the piston connecting rod AND using a new connecting rod bolt.

Procedure 11 24, 2AZ torque procedure is if you are only using a new connecting rod bolt.


I couldn't find anything about rod bolts at 1111. Please see attached file. Thank you!

Name:  1111.png
Views: 1876
Size:  39.5 KB
Appreciate 0